Baoshengda Technology · ShenzhenCompany and factory

Engineering Downloads

Request the specification forms, checklists, or drawing templates appropriate to the product, drawing stage, and intended use. Confirm the document scope and revision date before use.

Layered membrane-switch sample showing the overlay, adhesive, and printed circuit
Document typesspecification forms, checklists, drawing templates, document scope, and revision dates
State the needProduct, project stage, intended use, and revision
Check before useApplicable product, release date, and current drawing

Project documents

Download a checklist or request project files

Start with the general input checklist. Specifications and review documents are provided according to the product, revision, and project scope.

General checklist

Project input checklist

Text file · editable after download

Download TXT →
Request by project

Specification template

Confirm the applicable scope and revision

Request document →
Request by project

Graphic-overlay artwork checklist

Confirm the applicable scope and revision

Request document →
Request by project

Supplier review information

Confirm the applicable scope and revision

Request document →

Files and revisions

Confirm the intended use before requesting a document

Specifications, checklists, and drawing templates vary by product and project stage, so the revision should be checked before use.

How do we request the specification or checklist that fits the current project?

State the product type, drawing stage, and intended use. We can then identify the appropriate document type and revision so a general template is not mistaken for the current project specification.

What should we provide when requesting a template or checklist?

State the product type, project stage, drawings already available, and intended use of the document. For an audit or acceptance activity, also identify the project and revision need.

How do we confirm that a file applies to the current project?

Check the document name, revision, date, product scope, and completion instructions, then align it with the current drawing and approval checklist.

What should happen when a document is revised?

Keep the old and new revisions and the reason for change in the project record, identify the current released revision, and prevent production, inspection, or communication from continuing with the obsolete file.

Project RFQ

Send a drawing—or begin with the equipment use

Artwork, enclosure dimensions, sample photos, or a question list can all start the engineering review.

Submit available information →or call 0755-86130964
UpdatedSite maintained byBaoshengda Technology