Baoshengda Technology · ShenzhenCompany and factory

Engineering Downloads

Download the general project input checklist directly as a TXT file. Request specifications, artwork checklists, or supplier review documents by email or WeChat, stating the product, project stage, and intended use. Confirm the scope and revision before use.

Layered membrane-switch sample showing the overlay, adhesive, and printed circuit
Document typesspecification forms, checklists, drawing templates, document scope, and revision dates
State the needProduct, project stage, intended use, and revision
Check before useApplicable product, release date, and current drawing

Project documents

Download a checklist or request project files

Download the project checklist or a blank specification worksheet. Product data and review documents are confirmed for the product, revision and project scope.

General checklist

Project input checklist

Text file · editable after download

Download TXT →
Request by project

Specification template

Confirm the applicable scope and revision

Request by project

Graphic-overlay artwork checklist

Confirm the applicable scope and revision

Request by project

Supplier review information

Confirm the applicable scope and revision

Files and revisions

Confirm the intended use before requesting a document

Specifications, checklists, and drawing templates vary by product and project stage, so the revision should be checked before use.

How do we request the specification or checklist that fits the current project?

Request project documents by email or WeChat. State the document name, product type, drawing stage, and intended use so the appropriate scope and revision can be confirmed. The general project input checklist can be downloaded directly as a TXT file.

What should we provide when requesting a template or checklist?

State the product type, project stage, drawings already available, and intended use of the document. For an audit or acceptance activity, also identify the project and revision need.

How do we confirm that a file applies to the current project?

Check the document name, revision, date, product scope, and completion instructions, then align it with the current drawing and approval checklist.

What should happen when a document is revised?

Keep the old and new revisions and the reason for change in the project record, identify the current released revision, and prevent production, inspection, or communication from continuing with the obsolete file.

Project RFQ

Send a drawing—or begin with the equipment use

Artwork, enclosure dimensions, sample photos, or a question list can all start the engineering review.

Contact the project team →or call +8675586130964
UpdatedSite maintained byBaoshengda Technology