Project Testing and Inspection Review Guide
During supplier and project reviews, examine equipment, calibration, methods, samples, conditions, records, and acceptance criteria together with the current drawings, samples, lot records, and inspection requirements.

Inspection and test records
A test result needs a method, sample, condition, and acceptance rule
Owning test equipment does not prove that a particular sample passed. A useful record identifies what was tested, the equipment and calibration state, sample preparation, applied conditions, raw observations, and the rule used to accept or reject the result.
Equipment and calibration
Confirm the instrument range, calibration status, and suitability for the sample and measurement being requested.
Method and conditions
Record sample quantity, preconditioning, load, environment, cycle profile, duration, and acceptance criteria.
Trace result to sample
Link the report and raw data to the drawing revision, material lot, sample status, and any deviation decision.
Supplier review
Connect documents, the factory floor, and project records
For Project Testing and Inspection Review Guide, check the applicable scope, inspection conditions, and records for the current project together.
What should be prepared before Project Testing and Inspection Review Guide?
Start with “Equipment and calibration” and provide the current drawings, sample information, and operating conditions. Confirm the instrument range, calibration status, and suitability for the sample and measurement being requested.
How should the outcome of Project Testing and Inspection Review Guide be confirmed?
Use “Method and conditions” and “Trace result to sample” to review samples, process records, and acceptance methods. Record the result in the current project revision and agree the relevant conditions and acceptance requirements.
Project RFQ
Send a drawing—or begin with the equipment use
Artwork, enclosure dimensions, sample photos, or a question list can all start the engineering review.
