Baoshengda Technology · ShenzhenProject review guide

Screen Printing and Silver-Circuit Process Review Guide

Before production, document equipment, screens, ink or silver paste, curing, process control, samples, and inspection, then confirm the relevant requirements against the released drawings, approved samples, and acceptance criteria.

Screen-printing reference image for reviewing equipment, materials, and process records
Process focusequipment, screens, ink or silver paste, curing, process control, samples, and inspection
Useful inputsUse, drawings, assembly, quantity, and target timing
Approval basisApproved sample, controlled drawings, and inspection method

Control printed features

Review graphics and circuit requirements

Graphic ink and conductive silver printing solve different functions but both depend on artwork, screen, substrate, ink condition, deposition, curing, registration, and inspection. Project tolerances are agreed against the actual process, measurement method, and representative samples.

01

Define the print system

Identify substrate, ink or paste, screen, artwork revision, print order, cure method, environment, and controlled process variables.

02

Protect registration

Set datums and tolerances among colors, legends, windows, contacts, conductors, holes, tail features, and downstream cutting.

03

Inspect the right output

Check appearance, dimensions, adhesion, cure, continuity or resistance, defects, samples, method, and record linkage.

Process handoff

Connect drawings, samples, inspection, and production

Keep Screen Printing and Silver-Circuit Process Review Guide aligned with the released drawings, approved sample, and downstream inspection records.

Should graphics and circuits use separate files?

Provide artwork and circuit files separately with shared alignment references and revisions. Images can support the initial discussion, but confirm clear production files before preparing screens.

Can one check cover both color and continuity?

No. Check color, opacity, and appearance against the color reference or artwork. Check continuity and circuit behavior separately against the circuit definition and electrical requirements.

Project RFQ

Send a drawing—or begin with the equipment use

Artwork, enclosure dimensions, sample photos, or a question list can all start the engineering review.

Submit available information →or call 0755-86130964
UpdatedSite maintained byBaoshengda Technology